
Jetty Sump Internal and Top Side Remediation
- Client: Santos
- Location: Port Bonython, South Australia
Scope
- The project included several structural and coating remediation works.
The Challenges
- Existing coating removal: Coal Tar Paints removed using UHP washing
- Mercury containment in existing paints / Mercury monitoring
- Confined space works and Confined space rescue
- Repairs by welding from inside and outside the tank
- Repairs with coating
- Repairs with Belzona for piping flanges and tank roof